Commissioning
Quick Reference Instruction Manual for Spare
Sensor replacement
IM01U10A01-00EN-R, 1
st
edition, 2019-12-09
27 / 76
6.5 Commissioning
1. Activate external power switch.
2. Perform check of piping installation.
3. Check flow meter for device errors, warnings or alarms,
see chapter on Troubleshooting [}74]
4. Configure the transmitter, and perform autozero,
see chapter on System configuration and operation [}73].
ð Flow meter is ready for operation.