EasyManua.ls Logo

Zip HydroTap G5 BCS - Installation Readiness Checklist

Zip HydroTap G5 BCS
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
806834 v1.02 07.21 G5 Online install instructions and user guide
11
SAFETY
INSTALLATION
TROUBLE
SHOOTING
COMMISSION
USER GUIDE
TAP SAFETY
LCD SCREEN
CONTACT
INSTALLATION
GUIDE
Check if there is adequate space to install all of the components.
Note Not all fittings are supplied with the appliance kit. Isolation valves are not
supplied.
Check the mains water pressure is within min / max requirements (see page 8).
Check the water quality to determine if extra filtration will be required.
Note This product must be fitted to a wholesome water supply.
Check the Command Centre rating plate and ensure correct power is available.
Check the under counter cupboard floor supporting the Command Centre is adequate
for its total weight, when full of water.
Before commissioning
Check the system has been installed correctly.
Check all plumbing fittings for water tightness.
Ensure the outlet and vent pipes are positioned to drain correctly.
Ensure there is adequate ventilation.
Check all tubes and pipes from the Command Centre to the tap have a constant rise and
there are no sags or kinks in the hoses.
Commissioning
Flush the supply line before connecting.
Turn on the water and check for leaks.
Flush the filter(s).
Activate / enable the booster (if fitted).
Adjust the carbonation flow valve (sparkling models).
Calibrate the safety sensor for boiling models (optional).
Where applicable, programme the Command Centre to suit the customers
requirements.
Installation checklist
!
UV
!
!
UV
!
!
UV
!
!
UV
!

Table of Contents

Related product manuals