EasyManuals Logo

AAON Orion VCCX2 User Manual

AAON Orion VCCX2
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #64 background imageLoading...
Page #64 background image
64
VCCX2 Controller Technical Guide
Before Applying Power
In order to have a trouble free start-up, it is important to follow a
few simple procedures. Before applying power for the rst time,
it is very important to run through a few simple checks.
Power Wiring
One of the most important checks to make before powering up
the system for the rst time is to conrm proper voltage and
transformer sizing for each controller. Each VCCX2 Controller
requires 15 VA of power delivered to it at 24 VAC. You may
use separate transformers for each device (preferred) or power
several devices from a common transformer. If several devices
are to be powered from a single transformer, correct polarity
must be followed.
WARNING: Observe Polarity! All boards must be wired
with GND-to-GND and 24 VAC-to-24
VAC. Failure to observe polarity will result
in damage to one or more of the boards.
Check all wiring leads at the terminal block for tightness. Be sure
that wire strands do not stick out and touch adjacent terminals.
Conrm that all sensors required for your system are mounted
in the appropriate location and wired into the correct terminals
on the VCCX2 Controller.
After all the above wiring checks are complete, apply power to
the VCCX2 Controller.
Conguring the Controller
The next step is conguring the controller for your specic
requirements. In order to congure the VCCX2 Controller, you
must use an operator interface. Four dierent operator interfaces
are available for programming and monitoring of the VCCX2
Controller. See Figure 45, this page. They are as follows:
Modular Service Tool SD
Modular System Manager SD
PC with Prism 2 Software & CommLink 5 Installed
System Manager TS-L (Touch Screen - Limited Access)
Any of these devices or a combination of them can be used to
access the status, conguration, and setpoints of any controller
on your communications loop.
If using the Modular Service Tool SD or the Modular System
Manager SD for programming, refer to the VCCX2 Controller
Operator Interface SD Technical Guide. If using a computer
and the Prism 2 software for programming, refer to the Prism 2
Technical Guide.
If using the System Manager TS-L for monitoring, please see
the System Manager TS-L Technical Guide.
No matter which operator interface you use, we recommend that
you proceed with the programming and setup of the VCCX2
Controller in the order that follows:
1. Congure the Controller for your application.
2. Program the Controller setpoints.
3. Program the Controller operation schedules.
4. Set the Controller current time and date.
5. Review Controller status screens to verify system
operation and correct Controller conguration.
NOTE: For BACnet
®
Conguration, see Appendix C,
page 117.
Figure 45: Modular Service Tool SD, Modular System
Manager SD, System Manager TS-L, and
Prism 2 Software Operator Interfaces
START
-
UP AND COMMISSIONING
Powering Up and Conguration

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AAON Orion VCCX2 and is the answer not in the manual?

AAON Orion VCCX2 Specifications

General IconGeneral
BrandAAON
ModelOrion VCCX2
CategoryController
LanguageEnglish

Related product manuals