EasyManua.ls Logo

ABB ACQ580-34 - Unpacking the Delivery; Installing the Control Unit

ABB ACQ580-34
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 m (9.8 ft)
3 m (10 ft)
2560 mm (8.4 ft)
CAT 5e
ZBIB
BGDR
X7 (STO1)
X8 (STO2)
INU STO
QOIA
ZINT
V8
V13
A
B
1
2
4
V7
V2
V20
V21
V1
V2
ZPOW
X2X3
3
X12
DPMP-03
Drive moduleBCCU-24 control unitA
1 × 24 V power supply cable (with a ground con-
nection)
32 × Safe Torque Off (STO) cables1
CAT 5e cable, must be ordered separately42 × pair of optical cables for all major converter
power stack communication.
2
Unpacking the delivery
The external control unit is in a separate box inside the main drive module box.
Installing the control unit
Determine where the control unit is to be located. Take into account the cable lengths, the
physical dimensions and mounting points of the control unit assembly (see section Dimension
drawing (page 132)). Install the unit inside an enclosure for protection.