EasyManua.ls Logo

ABB Navigator 500 Series - Page 28

ABB Navigator 500 Series
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Navigator 500
Sodium analyzer 5 Calibration
26 OI/ASO550–EN Rev. G
7. Press the key (below the Select prompt).
The Sensor 1 (4) / Sensor Three Stream page (dependent
on single-stream / multi-stream configuration) is displayed
with the Sensor Calibration menu selected:
8. Press the key (below the Select prompt on the Sensor
1 (4) / Sensor Three Stream page).
The Sensor Calibration page is displayed:
Press the key to highlight the Process Calibration
menu.
9. Press the key (below the Select prompt).
The Process Calibration page is displayed:
At the wet-section:
10. Place the drain tube from the constant-head unit into the
sample vessel (during the sampling period an average
sodium concentration value is determined).
At the transmitter:
11. Press the key (below the Yes prompt).
The Process Calibration / Sample Collection page is
displayed:
12. Press the key (below the Start prompt).
The next Process Calibration / Sample Collection page is
displayed with a progress bar:
When sufficient sample has been collected in the sample
vessel, the collected sample must be analyzed using a
laboratory method or another analyzer to determine the
concentration of sodium in the sample.
13. Press the key (below the Stop prompt) to stop the
procedure manually.
The next Process Calibration / Sample Complete page is
displayed with the progress bar populated:
Sensor 1
Sensor Calibration
Scheduled Calibration
Calibration Setup
Restore Defaults
Back Select
Sensor Calibration
Low Calibration
High Calibration
Two-Point Cal
Regeneration Cycle
Process Calibration
Grab Sample
Back Select
Process Calibration
Start Procedure
No Yes
Note. To abort the process calibration procedure
during this collection press the key (below the
Abort prompt).
Note. If the procedure is not stopped manually, it
stops automatically after 30 minutes.
Process Calibration
PV 2.93 ppb
Sample Collection
Abort Start
AVG 2.92 ppb
Sample Collection
Process Calibration
Abort Stop
AVG 2.93 ppb
Sample Complete
Process Calibration
Abort Continue

Table of Contents

Related product manuals