EasyManua.ls Logo

ABB REC 561 - Testing

ABB REC 561
643 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB Network Partner AB
Event recorder - Station
Monitoring System
Version 1.0-00
1MRK 580 139-XEN
Page 7 - 66
For each of the binary input and output signals, a user-defined name can
be programmed at:
Configuration
Slotnn-XXXX (ex. Slot15-BOM3)
See Disturbance report - Settings (1MRK 580 133-XEN), for more infor-
mation.
4Testing
During testing, the Event recorder can be switched off if desired. This is
found in the SMS or Substation Control System (SCS).

Table of Contents

Related product manuals