66 Rockwell Automation Publication 6000-TG100A-EN-P - September 2020
Chapter 7          Inspect Connections
Inspect Power Cell Input 
and Output Power 
Connections
Verify that all Power Cell input line cables and output bus connections are 
properly torqued. Verify that the output cables, VSB Cables, and star 
connection cables are properly torqued. Apply torque sealer if necessary. Check 
for corrosion, excessive temperature, or contamination.