Rockwell Automation Publication 6000-TG100A-EN-P - September 2020 67
Index
A
AC/DC Power Supplies
Inspect
 22
Maintenance Schedule
 19
Air Filters
Clean
 20, 28
Replace
 28
apply power 13
B
backplane circuit board
install
 41
remove
 41
C
Commissioning Support 9
component
inspection
 27
Connections
Inspect
 22
Maintenance Schedule 19
Control Pod
Maintenance Schedule
 19
control pod
inspect
 28
install
 49
remove 47
control pod cover
install
 36
remove
 35
control pod fan assembly
install
 47
remove
 46
D
Door Mounted Air Filters
Clean/Replace
 28
Maintenance Schedule
 19
E
E-HIM
Maintenance Schedule
 19
equipment
maintenance
 20
F
fan
inspection
 27
fiber transceiver circuit board
install
 38
remove
 37
filter
inspect
 27
Firmware
Maintenance Schedule
 19
Fuse
Replace
 63
G
General Precautions 8
H
HECS
Hardware
 55
Inspect 55
Maintenance Schedule
 19
Mounting Bracket
 56
Replace 55
HMI
Firmware
 24
Inspect/Replace
 50
I
inspect
components
 27
control pod
 28
filter
 27
inspection
fan
 27
Install Power Cell
 61
Isolation Transformer
Clean/Replace Air Filters
 28
Fan Balance
 33
Inspect 53
Inspect Secondary Windings
 65
Maintenance Schedule
 19
Replace HECS 55
Replace Voltage Sensing Board
 53
Top-mounted Cooling Fans
 30
Isolation Transformer Cabinet
Replace Top-mounted Cooling Fans
 30
L
Lift Cart
Operation
 62
Lockout and tagout
 13
LV Control Cabinet
HMI Firmware
 24
Maintenance Schedule
 19
Replace HMI
 50
LV Control Circuit Breakers
Inspect
 22
Maintenance Schedule
 19
LV Control Relays
Inspect
 22
Maintenance Schedule
 19