EasyManua.ls Logo

Amada UNIFLOW 4 REMOTE - Section III: Equipment Setup

Default Icon
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2: INSTALLATION AND SETUP
UNIFLOW
®
4 PULSED HEAT CONTROL
2-10 990-908
Section III: Equipment Setup
Force Fired, Mechanically Actuated Head
NOTE: If you are using an Air Actuated Head, skip this section and go the next page for the Force
Fired Air Actuated Head instructions.
1. Adjust the reflow soldering head force adjustment knob to produce 5 units of force, as
displayed on the force indicator index.
2. Connect the reflow soldering head firing switch cable connector to the Control firing switch
INITIATE cable connector.
3. Set the HEAT/NO HEAT switch on the Control front panel to the NO HEAT position. In this
position, the Control cannot deliver heating energy to the thermode.

Table of Contents