12
2. The earth cable closest to the cabinet body must have an M4 SPW beneath the lug then an
M4 SPW and M4 nut.
3. Each addional earth cable must be terminated with an M4 SPW and M4 nut.
4. An addional M4 nut and M4SPW are ed to the earth terminal for installers to connect
the mains earth
Figure 10: Chassis Earth Terminal Connecon
4.2 Battery Charger
The baery charger is an integral part of the Power Supply and is capable of;
➢ Recharging standard sized system baeries within 24 hours;
➢ Detecng a missing, damaged or undercharged baery;
➢ Protecng the baery against reverse or a short circuit condion;
➢ Charging baeries in line with Sealed Lead Acid baery manufacturers’ circuit temperature
compensaon guidelines.
Note: Baery disconnect has been incorporated to prevent the baery from discharging through
the baery charger should the charging voltage be less than the baery voltage.