13
4.3 Secondary Supply
In the event of a mains failure the backup baery is capable of maintaining the quiescent condion
for 72 hours as well as full alarm load for a further period of 30 minutes.
Note: Any power supply fault to be indicated within 1 hour.
4.3.1 Connecting the Stand-By Batteries
Two new, good quality and fully charged 12V Sealed Lead Acid baeries are required as the
emergency stand-by power supply for the Panel. They are to be mounted in the boom of the
cabinet. In the ABS version a protecve tray is supplied in the packaging.
The baeries should be connected in series using the series link wire provided and located within the
panel enclosure. The red and black baery leads from the Power Supply ( CN 3 ) should be run to the
baeries in such a way there is no risk of them being damaged then, connect the red wire to the
posive terminal and the black wire to the negave terminal .
The panel's sophiscated baery monitoring protects the baeries against deep discharge by
acvang a cut o circuit when the stand-by supply voltage reaches approx 21 volts. If baeries are
not ed, are discharged or in poor condion, the “POWER FAULT “LED will be illuminated.
The capacity of the baeries to be installed depends on the panel conguraon and required stand-
by me. To calculate the required AH capacity of the baeries refer to the calculaon guide located
in the rear of this manual.
4.4 Cable Types and Limitations
All System wiring should be installed to meet naonal wiring regulaons.
To shield the Panel from outside interference and ensure compliance with Electro Magnec
regulaons screened cables can be used throughout an installaon.
4.5 Powering Up the Panel
Note: It is not recommended to connect the baeries before applying mains power rst.
Ensure that the panel is free from swarf, wire ends, knockout blanks and any other debris
Ensure that all cable connecons to zones, sounder circuits and other inputs or outputs being used
are correct and that the wiring is formed neatly away from the surface of the circuit boards before
applying power.
Connect the mains, and turn on the Panel by switching the power supply switch to the on posion.
Check the polarity of the baery connecons carefully before proceeding.
Connect the baeries together rst by ng the baery link (typically a white cable) to a +ve terminal
of one baery and to a –ve terminal of the second baery.
Connect the red baery lead to the +ve terminal of the second baery and the black baery lead to
the –ve terminal of the other baery.
Note: It is not recommended to connect the baeries before applying mains power rst.