EasyManuals Logo

Apator Metra E-ITN 30 Installation And Service Manual

Apator Metra E-ITN 30
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
E-ITN 30
Installation and service manual M2019/01a [EN]
tighten the nuts to a torque 1 Nm,
place the allocator into the back plate profile groove from top, align it with the base plate and push
allocator to connect it with the back plate.
After installation, installation protocol have to be filled up (including date of installation, room, type of the
radiator, allocator serial number, etc.)
Warning!
Televisions or other devices with screen must be apart at least 2-3 meters from the place welding.
Devices must be switched off and disconnected from electrical network. Shock during welding can
negatively affect pacemaker. It is necessary to warn the user and explain him requirement of his
absence during installation.
27 / 46

Table of Contents

Other manuals for Apator Metra E-ITN 30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Apator Metra E-ITN 30 and is the answer not in the manual?

Apator Metra E-ITN 30 Specifications

General IconGeneral
BrandApator Metra
ModelE-ITN 30
CategoryControl Unit
LanguageEnglish

Related product manuals