5 Start up LP
© Copyright Reserved Autonics Co., Ltd. 69
5 Start up LP
This chapter describes start up procedure from supplying power to LP to switching user screen.
5.1 Checking list before supplying power
Before supplying power to LP-S070, please check the following list.
No
Check
Description
1
Install status
Check waterproof rubber ring is installed.
Check all 4 fixing brackets are installed.
Check fixing brackets are fixed with approved tightening torque.
2
Emergency stop
circuit
Check individual emergency stop circuit at the external LP-S070 is placed.
Check there is problem to emergency stop when error occurs.
3
Ground
Check ground cable is installed with separated other device ground cable.
Check there is 3rd grounding.
4
Power cable
Check cable connection by polarity.
Check the tightening status of screws on terminal.
5
I/O wiring
Check I/O wiring status.
Check connector connection status.
6
Power
Check power voltage.
Check this is installed as separated other device power.