Page #22 background imageLoading...
Page #22 background image
64394-009 Integrated Pit Lid Hanger Install Kit
ORI-UM-00025-EN-19
64394009 INTEGRATED PIT LID HANGER INSTALL KIT
Integrated Pit Lid Hanger Install Kit (PN: 64394-009) is designed for ORION endpoints installed below composite and
plastic lids that have an integrated AMR/AMI endpoint hanger.
For use with: ORION Fixed Network, Migratable, and Classic endpoints
To install an ORION endpoint with this kit, follow these steps and refer to Figure 36.
1. Thread the lock nut onto the top of the ORION endpoint as shown.
2. Slide the endpoint into the lid bracket.
3. Tighten the lock nut so that the endpoint is held rmly in place.
Installation is complete.
Figure 36: Integrated pit lid hanger installation
Page 22 February 2019

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Badger Meter ORION Cellular LTE-M and is the answer not in the manual?

Badger Meter ORION Cellular LTE-M Specifications