EasyManua.ls Logo

Braun Infusomat Space - Page 48

Braun Infusomat Space
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly / Assembly
3
3 - 2 Infusomat® Space 6.0
EN
Preparations for Exchanging the Processor PCB
If the processor PCB is to be replaced, a back-up of the pump set-
tings is to be carried out, if this is still possible.
Please note that text and / or functions of the Service Program
may change depending on the software version. The following
screenshots are only examples and represent the state when the
manual was printed.
1. Start the Service Program (see „Starting the Service Program“
pg. 1 - 10).
2. Select the tab “Modification data”.
3. Press the „From device“ button. The
data are read from the
device and shown on the display.
Fig.: 3 - 1

Other manuals for Braun Infusomat Space

Related product manuals