8
Unpacking Precautions
The unit is shipped ready for installation. Avoid
damage from dropping, bumping, collision, etc. Store
and unpack carton with the proper side up, as noted
on the shipping carton.
Delivery Inspection
After removing the carton, carefully inspect the
generator for any damage that may have occurred
during shipment.
If loss or damage is noted at time of delivery, have
the person(s) making delivery note all damage on the
freight bill and affix his signature under the consignor’s
memo of loss or damage. If loss or damage is noted
after delivery, separate the damaged materials
and contact the carrier for claim procedures. Parts
damaged in shipping are not warranted.
Shipment Contents
The standby generator system is supplied with:
Oil (5W30 Synthetic)
Flexible steel fuel line
Installation/Operation manual
Product and emissions warranty booklet
Spare access roof keys
Spare 15 Amp ATO-type fuse
Tamper proof plug
Not included:
Carbon monoxide detector(s)
Smoke detector(s)
Starting battery
Connecting wire and conduit
Fuel supply valves/plumbing
Crane, lifting straps, chains or cables
Two 60” lengths of 3/4” nominal minimum
scheduled 40 steel pipe (NOT conduit)
Torque screwdriver, 5 to 50 inch-pound range
Voltage/frequency meter

Table of Contents

Related product manuals