5 Packaging and transportation
5.1 Scope of delivery
The boiler is delivered factory-assembled.
z When receiving the delivery, check if the packaging is
intact.
z Check that all items are included in the delivery (fig. 4).
5.2 Transporting the boiler
Fig. 4 Items supplied with unit
0
1
2
3
4
1
2
4
8
3
6
7
5
9
10
Pos. Parts Qty Packaging
1 Boiler with casing 1 1 box
2 Wall bracket 1
3 Condensate trap with hose 1
4 Technical documents set 1
5 Supply and return union nuts with
sealing rings
2
6 Screws and plugs for wall bracket 2
7 Union nut for gas connection 1
8 DHW sensor 1
9 Pump group 1 1 box
10 Low loss header
(single installation only)
1 1 box
Table 2 Items supplied with GB162-80 kW/100 kW
CAUTION
The boiler may be damaged when it is improp-
erly secured.
z Only transport the boiler using the right
transportation equipment, such as a
handtruck with a fastening belt or special
equipment for manuevering steps.
z During transportation the boiler must be
secured on the transportation equipment to
prevent it from falling off.
z Protect all parts against impacts if they are to
be transported.
z Observe the transportation markings on the
packaging.
CAUTION
The unpacked boiler may be damaged when
not protected against contamination.
z Leave the protective covers on the connec-
tions.
z Cover the flue gas connections at the top of
the boiler with plastic film.