9.4 Bleed the gas supply valve
z Close the gas valve (fig. 52).
z Open the screw plug on the testing nipple of the gas
supply pressure and for purging (fig. 53, pos. 1) by
2 turns and install a hose.
z Slowly open the gas valve by pushing on the gas valve
and turning it counterclockwise through ¼ rotation
(fig. 54). The gas valve is open when it is in the vertical
position.
z Purge the gas supply into a well ventilated area.
z Close the gas shutoff valve when no more air is present
(fig. 52).
z Remove the hose and tighten the screw plug on the
testing nipple again.
9.5 Check the air/flue gas connection
Check the following points:
Is the prescribed flue gas system used (see
paragraph 6.7 "Installation of the Exhaust and Air Intake
system", page 24)?
Have the configuration instructions from the relevant flue
gas system installation instructions been observed?
Fig. 52 Closing the gas valve
Fig. 53 Bleeding the gas flow pipe
1
Fig. 54 Opening the gas valve
NOTICE
z Test the tightness of the measuring nipple(s)
used.