47
EN
10.3 Inspection
(Carried out by the operator in accordance with EN 806-5)
Inspection activities Interval Note for
products
WITHOUT
active
BWT DES
registration
Note for
products
WITH active
BWT DES
registration
According to use Required Required
Check brine containers for soiling Every 2 months Required Required
Check for leaks, visual inspection Every 2 months Required Required
Functional test/control unit display Every 2 months Required Not required
Test regenerative consumption depending
on the treated water
Every 2 months Required Not required
Check the setting of the regeneration waste
water system
Every 2 months Required Required
Check the counting function of the water
meter
Every 2 months Required Not required
Test the regeneration process Every 2 months Required Not required
Clean the brine container and the internal
surfaces that come into contact with water
Every 6 months Required Required