p. 8 - Manual FA01054-EN - 01/2018 - © CAME S.p.A. -
Translation of the original instructions
Preliminary operations
Fit junction boxes and corrugated tubing needed for the incoming connections from the distribution pit.
The number of tubes depends on the type of system and the accessories you are going to fi t. You need to set up at least
two corrugated tubes where the operator will be installed (
*
on the gate leaf that opens fi rst).
INSTALLATION
Only skilled, qualifi ed sta must install this product.
The following illustrations are mere examples in that the space for fastening the operator and accessories varies
depending on the installation area. It is up to the fi tter, therefore, to choose the most suitable solution.
The following drawings refer to a standard installation with the operator and drive arms on the left of an inward-
opening gate. Installing the gear motor with right-hand drive arms, is symmetrical.
⚠ For outward opening gate leaves, follow the chapter titled "INSTALLING AND CONNECTING FOR OUTWARD
OPENING".