UNI 5931
M8x20
M1 N1 ENC1
M2 N2 ENC2
M1 N1 ENC1
M2 N2 ENC2
p. 28 - Manual FA01054-EN - 01/2018 - © CAME S.p.A. -
Translation of the original instructions
BROWN
BLACK
BLUE
BROWN
BLACK
BLUE
For one-leaf swing gates.
Operator connection
Operator installed on the left (outer view).
Operator installed on the right (inner view).
Please refer to the chapter on opening inwards.
Establishing the limit-switch points
When closing.
Close the leaf. Fit the second stop against the opposite side of the arm and fasten it with the bolt.