EasyManua.ls Logo

Ceetec IP250 - Preparation of the Machine; Machine Placement and Connection; Adapter and Container Setup

Ceetec IP250
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 11 of 45
6 Preparation of the machine
1. The machine is placed on an even and firm surface, and the wheels are locked to ensure the
machine cannot move.
2. The electricity is connected.
3. Adapter for filter bag (1) is mounted on the drain pipe and the filter bag (2) is mounted to this. The
container with wood protection is placed under the filter bag, and the suction (3) and overpressure
hose (3) is placed in the container. Note that there is no overpressure valve on machines with
special pumps (e.g. air-powered membrane pumps).