EasyManua.ls Logo

Centurion VECTOR2 - 4. Additional features; 4.1. Solar power supply; 4.2. Lightning Protection

Centurion VECTOR2
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Critical Installation Checklist
The following is a list of critical requirements that must be adhered to in order to ensure
reliable operation of your VECTOR2 operators:
Ensure that the wall bracket is securely anchored
Make sure that the actuator’s maximum stroke is being utilised
Only use VECTOR cable for the installation
Leave a 350mm loop in the cable (refer to page 37)
Fit an electromechanical or an electromagnetic gate lock if the leaf width is greater
than three metres
Ensure that the opening and closing angles conform to the installation guidelines
Ensure that your gate and operators are equipped to deal with wind loading (refer to
the table on page 36)
Ensure that fixed mechanical endstops are fitted in the fully open position for outward
swinging gates
Page 23

Table of Contents

Other manuals for Centurion VECTOR2

Related product manuals