Operation Overview
3.14 Program
The program feature is very powerful. It allows you to simulate various test conditions.
There are ten programs in the Electronic Load. Each program has ten sequences. The
settings map to the program sequences in file is one on one. It means that program 1,
sequence 1 maps to file 1, and program 3, sequence 4 maps to file 24. Please see section
4.2.3 and 4.2.4 for setting and running the program
3.15 Synchronizing Dynamic and Static
Dynamic and Static loading in synchronization is provided for one FRAME and multiple
FRAMES (maximum 5 in parallel.)
New options and GPIB command:
(1) Add << SYNC PARALLEL >> ON/OFF selection in CONF for sync parallel. The
mapping GPIB command is SYNC: FRAME ON/OFF [1/0].
(2) Add <<MASTER/SLAVE SEL>> in CONF to set the FRAME to be MASTER or
SLAVE. The mapping GPIB command is SYNC: TYPE MASTER/SLAVE [1/0].
(3) Add <<SYNC. PARALLEL >> CHANNEL selection in CONF. It sets the T1 & T2
parameters of CCDL or CCDH for the set CHANNEL to be the DYNAMIC T1 & T2
value. The mapping GPIB command is SYNC: CHANnel x [1/8].
Procedure for manual setting:
(1) Connect the parallel cable.
(2) Set all modules to the same work mode.
(3) Set the relative parameters in CONF.
(4) Execute LOAD ON/OFF.
Procedure for remote setting:
(1) Connect the parallel cable.
(2) Set all modules to the same work mode.
(3) Set the relative parameters in CONF.
(4) Execute SYNC ON/OFF.
Specification: The sync loading time error is ±5uS.
3-13