8-4 Mounting Options
5150 Service Aggregation Switch Hardware Installation and Start-up Manual
009-3222-001 Standard Revision H
Copyright
©
2012-2015 Ciena
®
Corporation July 2015
23” Frame Mount Bracket - 2 RU
Orderable Part Number: 170-0026-900 (23” 2RU Mounting Bracket Kit)
The frame mount bracket is attached to the sides of an unpowered/
unconnected chassis and used to position the unit in a 23" frame. This bracket
kit also includes cable supports. The cable supports are installed on the
mounting brackets and are used to keep the cables out of adjacent equipment
space by directing them along the faceplate of the unit.
The mounting bracket kit includes:
• two brackets (the same bracket is used for both the left and right sides),
• four cable supports,
• four 8-32 x 5/8 length pan head screws (used to attach the cable supports
to the brackets), and
• eight 8-32 x 5/16 length pan head screws (used to attach the brackets to
the side of the chassis).
Note: The bracket will be installed on the sides of the chassis and near
the front of the chassis. The bracket will be positioned slightly behind the
front of the chassis. It is not installed flush with the front of the chassis.
When correctly installed, the back of the channel on the cable support
bracket will be approximately flush with the front of the chassis. See
Figure 8-1 on page 8-3.
Four screws are used to attach each bracket to the side of the 5150 chassis.
The bracket has four holes available to attach to the mounting frame.
For a procedure see “Installing the 23” Frame Mount Bracket - 2 RU” on page
8-8.