2-2 Installation
5160 Service Aggregation Switch Hardware Installation and Start-up Manual
009-3207-001 Standard Revision A
Copyright
©
2013 Ciena
®
Corporation September 2013
• Mounting bracket kit for 19” frame (two brackets, four cable supports, four
8-32 x 1/2 length screws used to attach the cable supports to the brackets,
and eight 8-32 x 5/16 length pan head screws used to attach the brackets
to the side of the chassis. See Figure 8-2 on page 8-4.)
If the unit is damaged or if any of the above items are missing, please contact
your sales representative.
Note: Mounting brackets for Wallmount, and 23-inch racks are also
available. If they are required for your installation, you need to order these
brackets separately.
You will also need to order:
• Power supplies (up to 2 AC or 2 DC power supplies)
• Power cables
• Grounding lug and grounding wire
• Alarm cable
• SYNC cable — BITS cable available in 100 or 120 Ohm
• 1 PPS cable
• 10 MHz cable
Note: Ciena offers a coax to SMB cable for connection to the 1 PPS and
10 MHz ports. The same cable can be used for both ports.
• SFP/SFP+ modules for the 1/10 Gigabit Ethernet ports (up to 24 ports)
• Faceplate cabling (Cat-5 STP and optical cabling to match the SFP and
SFP+ connector types used)
Required Tools and Supplies
For rack mount installations you will also require the following tools:
• Flat head screwdriver
• Phillips #2 screwdriver
• Digital Volt Ohm Meter
• rack screws (4 per device)
• cable ties / cord retainers — to secure ground, power and interface cabling
• Wire-strippers (for DC power cable)
• Fork terminal spade lugs (3 per DC power supply) — to install power
cabling to a DC system
• Power wire (14 AWG) — to install power cabling to a DC system
Note:
Table 2-1 on page 2-9 provides a summary of the DC lugs that are
recommended for use with the 5160.