2-1
5160 Service Aggregation Switch Hardware Installation and Start-up Manual
009-3207-001 Standard Revision A
Copyright
©
2013 Ciena
®
Corporation September 2013
Installation 2-
The 5160 is designed for deployment in Outdoor Street Cabinets (GR-3108
class 2), huts and other unconditioned locations. The 5160 can also be
deployed in a Central Office or Customer Premise environments. The 5160
Service Aggregation Switch can be mounted in a standard equipment rack
and requires 1 RU of space.
This chapter provides installation instructions. It discusses the following
topics:
• “Package Contents”
• “Important Safety Information”
• “Mounting the Device”
• “Grounding”
• “Power Supply Modules”
• “Alarm Cable”
• “Transceivers”
• “Cable Installation and Guidelines”
• “Initial Configuration”
Package Contents
Upon receipt, examine all shipping containers and their contents. Carefully
unpack the 5160 from the packing material. Visually inspect all parts for
damage.
The following items are shipped with the 5160:
• Chassis (with the power supply slot PSA empty)
• Filler plate (installed over the slot PSB)
• Grounding screws (the 2 grounding screws will be attached to the back of
the chassis in the center, see Figure 2-1 on page 2-5)