EasyManua.ls Logo

Cisco Catalyst IW9167I - Powering the Access Point

Cisco Catalyst IW9167I
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 2 Connect the supplied ground lug to the access point ground connection point using the supplied screws. Apply supplied
oxide inhibitor between the ground lug and the access point ground connection.
AP ground connection point1
Step 3 Tighten the screws to 20-25 inch-lbs of torque.
Step 4 If necessary, strip the other end of the ground wire and connect it to a reliable earth ground such as a grounding rod or
appropriate ground point on a grounded pole. Length of the ground cable should not exceed 1 meter, and 0.5 meter is
preferred. Use supplied oxide inhibitor on the grounded interface.
Powering the Access Point
The AP supports these power sources:
DC power 24–48 VDC
Cisco Catalyst IW9167I Heavy Duty Access Point Hardware Installation Guide
34
Installation Overview
Powering the Access Point

Table of Contents

Related product manuals