Index 7
clearing contents C-2
diagnostic C-3
replacement procedures 5-6
specifications 1-3
N
netbooting
automatically C-2
preventing C-2
network
activity indicator 4-4
connection considerations 2-10
network processor module
ATM 2-34
network processor modules
dual serial 2-20
Ethernet 2-10
FDDI 2-27, 4-10
LED indicators 4-4
locations 5-6
removing 5-4
replacing 5-20
Token Ring 2-13
nonreturn to zero
See NRZ
nonreturn to zero-inverted
See NRZI
note, description xvi
NRZ, configuring interface for 2-20
NRZI, configuring interface for 2-20
NT1 connection 3-6
numbering
interfaces 2-7
slot positions 2-7
O
o command (configuration register options) C-3
o/r command (reset) C-3
opening the chassis 5-1
operating
conditions
European Community F-1
temperature 1-3
operating conditions
United Kingdom E-1
optical bypass switch
connecting to 3-13
uses 2-28
ordering publications xv
overview, series 1-1
P
packing list 2-36
pinouts
auxiliary port A-2
BRI 3-8, A-22
console port A-2
EIA/TIA-232
dual-port A-4
four-port A-5
EIA/TIA-449
dual-port A-7
four-port A-8
EIA-530
dual-port A-16
four-port A-18
EIA-TIA-232, four-port A-5
Ethernet (AUI) A-19
RJ-45 A-20
serial cable A-3–A-18
Token Ring A-21
V.35
dual-port A-10
four-port A-11
X.21
dual-port A-14
four-port A-15
polarity, Ethernet LED 4-5
port
locations 2-7
software configuration, serial 4-8
power
LED indication 3-22
light 4-3
specifications 1-3
supply features 2-4
system, troubleshooting 4-2
preparing
for installation 2-1
to make connections 2-7
preventing ESD damage 2-3
preventive site configuration 2-4
printing summary of ROM monitor commands C-2, D-2
problem
indications 4-3
temperature 4-3
problem solving 4-1
processor specifications 1-3
protocol analyzer, attaching 2-9
publications, ordering xv