Installing the ONS 15454 M6 Shelf
This chapter explains how to install the ONS 15454 M6 shelf.
Unless otherwise specified, the ECU module refers to the ECU, ECU2, ECU-S, and ECU-60V units. For
details about the various ECU modules, see the External Connection Units, on page 72.
Note
ANSI Rack Installation, on page 2
ETSI Rack Installation, on page 4
Air Deflector, on page 6
Air Plenum, on page 6
Air Plenum Rack and Cabinet Compatibility, on page 8
NTP-G344 Install the Air Plenum in ONS 15454 M6 Shelf, on page 9
Air Flow Performance of ONS 15454 M6, on page 23
NTP-G252 Install the ONS 15454 M6 Shelf , on page 24
Front Door, on page 50
NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf , on page 53
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page 57
NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf, on page 62
NTP-G329 Remove the Deep-Front Panel of the ONS 15454 M6 Shelf , on page 69
External Connection Units, on page 72
NTP-G253 Install the ECU or ECU-S Module, on page 79
NTP-L68 Upgrading to ONS 15454 M6 ECU60-S Module, on page 82
Power Modules, on page 82
NTP-G524 Install the Power Modules in the ONS 15454 M6 Shelf , on page 85
LCD Unit, on page 96
NTP-G255 Install the LCD Module in the ONS 15454 M6 Shelf, on page 96
Power and Ground Description, on page 98
NTP-G256 Install Power and Ground to the ONS 15454 M6 Shelf , on page 100
Fan-Tray Assembly , on page 117
NTP-G257 Install the Fan-Tray Assembly in the ONS 15454 M6 Shelf, on page 118
Cable Routing and Management, on page 120
NTP-G290 Install the Cable and Fiber Modules, on page 121
Installing the ONS 15454 M6 Shelf
1

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Cisco ONS 15454 M6 and is the answer not in the manual?

Cisco ONS 15454 M6 Specifications

General IconGeneral
Slots6
Form FactorRack-mountable
ManagementCisco Transport Controller (CTC)
Network InterfacesEthernet, SONET/SDH, OTN
Storage Temperature-40°C to 70°C (-40°F to 158°F)
Relative Humidity5% to 95% non-condensing
Supported ServicesSONET/SDH, Ethernet, OTN

Summary

ANSI Rack Installation

Reversible Mounting Bracket

Details the reversible mounting bracket used for rack installation.

Mounting a Single Shelf

Instructions for mounting a single shelf in an ANSI rack.

Mounting Multiple Nodes

Guidance on mounting multiple shelves in ANSI racks.

ETSI Rack Installation

Mounting a Single Node

Instructions for mounting a single shelf in an ETSI rack.

Mounting Multiple Nodes

Guidance on mounting multiple shelves in ETSI racks.

Air Plenum

Air Plenum Rack and Cabinet Compatibility

Compatibility of air plenums with ANSI and ETSI racks/cabinets.

NTP-G344 Install the Air Plenum in ONS 15454 M6 Shelf

Procedure for installing the air plenum for front-to-back airflow.

Shelf Installation Procedures

NTP-G252 Install the ONS 15454 M6 Shelf

Procedure for the main shelf installation.

Front Door Handling

Information on standard and deep-front panels.

NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf

Procedure to install the deep-front panel.

Module Installation

External Connection Units

Details on ECU, ECU2, ECU-60V, ECU-S, ECU60-S modules.

NTP-G253 Install the ECU or ECU-S Module

Procedure for installing ECU or ECU-S modules.

NTP-L68 Upgrading to ONS 15454 M6 ECU60-S Module

Procedure for upgrading to the ECU60-S module.

Power Modules

Information on AC and DC power modules for the shelf.

LCD Unit

Description of the LCD unit and its function.

NTP-G255 Install the LCD Module in the ONS 15454 M6 Shelf

Procedure for installing the LCD module.

Fan-Tray Assembly

Details on the fan-tray assembly and its LEDs.

NTP-G257 Install the Fan-Tray Assembly in the ONS 15454 M6 Shelf

Procedure for installing the fan-tray assembly.

Power, Grounding, and Cabling

Power and Ground Description

Description of power and ground requirements.

NTP-G256 Install Power and Ground to the ONS 15454 M6 Shelf

Procedure for installing power feeds and grounds.

Cable Routing and Management

Guidelines for routing and managing cables and fibers.

NTP-G290 Install the Cable and Fiber Modules

Procedure for installing cable and fiber modules.

Network and Control Connections

NTP-G312 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections in Cisco ONS 15454 M6

Procedure for connecting alarm, timing, LAN, and craft interfaces.

Installation Acceptance and Verification

NTP-G264 Perform the ONS 15454 M6 Shelf Installation Acceptance Test

Procedure to perform shelf installation acceptance testing.

DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections

Task to inspect shelf installation and connections.

DLP-G579 Measure DC Voltage on the ONS 15454 M6 Shelf

Task to measure DC voltage on the shelf.