EasyManua.ls Logo

Cisco ONS 15454 M6 - Shelf Installation Procedures; NTP-G252 Install the ONS 15454 M6 Shelf

Cisco ONS 15454 M6
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bulk Chassis Flow, CFMDeflector ConfigurationCase
295.6215.3No deflectorsSide to Side
135.897.7Inlet and OutletETSI Front to Rear
258.6187.7Only InletETSI Front to Side
166.9120.5Inlet and OutletANSI Front to Rear
268.6193.5Only InletANSI Front to Side
NTP-G252 Install the ONS 15454 M6 Shelf
This procedure installs the shelf.Purpose
#2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
ETSI only:
Six M6 x 20 pan-head Phillips mounting screws
ANSI only:
Six #12-24 x 3/4 pan-head Phillips mounting screws
Tools/Equipment
NTP-G305 Unpack and Inspect the ONS 15454, ONS 15454 M2, and ONS 15454
M6 Shelves
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the
floor before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip
over. Statement 1048
Warning
This product requires short-circuit (overcurrent) protection, to be provided as part of the building
installation. Install only in accordance with national and local wiring regulations. Statement 1045
Warning
Installing the ONS 15454 M6 Shelf
24
Installing the ONS 15454 M6 Shelf
NTP-G252 Install the ONS 15454 M6 Shelf

Table of Contents

Related product manuals