Step 2 Connect the office power according to the fuse panel engineering specifications.
Step 3 Measure and cut the cables as needed to reach the ONS 15454 M6 from the fuse panel.
Step 4 Address the power according to local site practice.
Step 5 Strip 1/2 inch (12.7 mm) of insulation from all power cables that you will use.
Step 6 Crimp the lugs onto the ends of all the power leads.
Step 7 Verify that the DC power module is installed in Slot A or Slot B (or both) of the ONS 15454 M6 shelf.
Step 8 Remove the terminal block protective covers from the DC power modules (see the following figure).
Figure 84: Connecting Office PowerDC Power Modules (ANSI Only)
Step 9 Unscrew the nuts from the terminal block (see the following figure).
Installing the ONS 15454 M6 Shelf
109
Installing the ONS 15454 M6 Shelf
DLP-G572 Connect Office Power (DC) to the ONS 15454 M6 Shelf (ANSI Only)