Contents
iv
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-06
Information About Link Continuity 3-2
Bypass Mechanism 3-3
Maintaining the Network Links vs Maintaining SCE 2000 Platform Functionality 3-3
Information About Asymmetric Routing Topology 3-3
Asymmetric Routing Topology 3-4
Asymmetric Routing and Other Service Control Capabilities 3-4
Information About Physical Topologies 3-4
Information About Inline SCE 2000 Topologies 3-4
Single Link: Receive-only Topology 3-6
Dual Link: Receive-Only Topology 3-7
Information About Two Cascaded SCE 2000s For Dual Links 3-8
Two Cascaded SCE 2000s: Inline Topology 3-8
Information About Topology-Related Parameters 3-10
SCE 2000 Configuration 3-10
Connection Mode Parameter 3-10
Physically Connected Links Parameter 3-11
Priority 3-11
On-Failure Mode Parameter 3-11
CHAPTER
4 Installation and Maintenance 4-1
Information About Preparing to Install the SCE 2000 Platform 4-1
Tools and Parts Required 4-2
Information About Site Requirement Guidelines 4-3
Airflow 4-3
Site Requirements 4-3
Installing the SCE 2000 Platform 4-4
Installation Precautions 4-5
How to Install the SCE 2000 on a Workbench or Tabletop 4-5
What to Do Next 4-6
Rack-Mounting a SCE 2000 Platform 4-6
How to Attach the Brackets to the SCE 2000 4-7
How to Attach the Crossrail Supports to the Rack 4-9
How to Mount the System to the Rack 4-10
How to Attach a Chassis Ground Connection 4-12
Removing and Replacing a Power Supply Unit 4-14
Information About the Power Supply 4-14
LEDs 4-15
Power Supply Specifications 4-17
Powering Down the Power Supply Unit and Disconnecting Input Power 4-17