EasyManua.ls Logo

Cisco WS-X6148-GE-TX - Switch - Page 88

Cisco WS-X6148-GE-TX - Switch
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Send document comments to ucs-docfeedback@cisco.com
C-2
Cisco UCS 6100 Series Fabric Interconnect Hardware Installation Guide
OL-20036-02
Appendix C Site Planning and Maintenance Records
Site Preparation Checklist
Ta b l e C-1 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2 Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Air flow
3 Power evaluation:
Input power type
Power receptacles
1
Receptacle proximity to the
equipment
Dedicated circuit for power supply
Dedicated (separate) circuits for
redundant power supplies
UPS
2
for power failures
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
4 Grounding evaluation:
Circuit breaker size
CO ground (AC- powered systems)
5 Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6 EMI
3
evaluation:
Distance limitations for signaling
Site wiring
RFI
4
levels

Table of Contents

Related product manuals