98-141779-G 5-1
Chapter 5
5555
Power and start up 5
This chapter has the following section:
• Power-up procedure
5.1 Power-up procedure
1. Connect power to the ACU.
2. Switch on the ACU. The unit starts up and goes through an initialization procedure:
•ACU POST
• ADU Initializing
•ADU POST
•READY
This may take some time (up to a couple of minutes).
3. The SAILOR 100 GX is ready to be calibrated (for first time power up) or receive data
from the modem (when in normal operation).
The LEDs Power and Fail/Pass are steady green, the LED Logon is off. For further
information on status indicators see Status signalling with LEDs and status messages
on page 8-16.
Make sure there are no hardware failures or error codes shown in the display of the
ACU. For more information on error codes and events see System messages on
page D-1.
4. Make an azimuth and a cable loss calibration, see Heading input and position system
on page 6-4.
Switch on the modem.
5. For more detailed step-by-step instructions, see the chapter Configuration on page 6-1.