Power-up procedure
5-2 Chapter 5: Power and start up 98-141779-G
5.1.1 Initialisation steps in daily use
Once the system is configured and a satellite profile is active, the startup sequence is as
follows:
•ACU POST
• Antenna initializing
• Antenna SW upload (If the software versions in the ADU and ACU are not the same,
a software update is done during startup.)
• Antenna POST
•READY
• POINTING ANTENNA
•ACQUIRING SIGNAL
•TRACKING
5.1.2 SAILOR 100 GX operational
When the display shows TRACKING. MDM: NETOK and the LED Logon is steady green
the system is operational.
Figure 5-1: ACU: LEDs, display and keypad (detailed, example)
Main NAV:GH MDM: NETOK LAN: 1 – 3 4
TRACKING
6$7:5;/+7;0$5