InteliMains
NT
, SW version 3.0  
InteliMains-NT-BTB-3.0-Reference Guide.pdf, ©ComAp – June 2013   
This setpoint is used to prevent this situation. If the #NextStrt del timer is 
already counting down (i.e. the condition for starting of next gen-set based 
on reserves is fullfiled), the total load of running gen-sets reach 90% of 
their nominal capacity and the remaining time of the running timer is higher 
than #OverldNextDel, the running timer is shortened to the value of 
#OverldNextDel to speed up the start-up of the next gen-set. 
NOTE:  
The setpoint takes place only in island operation. 
 
NOTE:  
# sign in the name of this setpoint marks that this setpoint is shared among 
all controllers connected by CAN2 bus.  
 
 
12.2.8.24  Setpoint: #NextStopDel 
This setpoint is used to adjust the delay of stopping the next gen-set when 
the actual load reserve rises above the adjusted load reserve for stop. 
NOTE:  
# sign in the name of this setpoint marks that this setpoint is shared among 
all controllers connected by CAN2 bus.  
 
 
12.2.8.25  Setpoint: #SlowStopDel 
This setpoint is used to adjust how long the particular gen-set will suppress 
it's own Slow stop alarm to give chance to another gen-set to start and 
replace the defective one. 
If there isn't any available gen-set to start, the alarm is not suppressed. 
NOTE:  
# sign in the name of this setpoint marks that this setpoint is shared among 
all controllers connected by CAN2 bus.