EasyManua.ls Logo

Daedong HX9010 - When Using the 3-Point Hitch

Daedong HX9010
270 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HX9010/1001/1151/1201
1
-
16
WARNING
Before driving an implement
through the PTO, always make
sure that all bystanders are well
away from the tractor.
When using the PTO drive with
a stationary tractor, always
make sure that the gears are
in neutral and that the parking
brake is applied.
Before starting up any PTO-driv-
en implement hitched to the
three-point linkage, lift the
implement to its full height and
check that at least 1/4 of the
total length of the telescopic
section of the drive shaft is
engaged.
Ensure that implements and
attachments are properly in-
stalled and that the tractor and
implement PTO RPM ratings
match.
3. Before installing or using P.T.O driv-
en equipment, read the manufactur-
er's manual and review the safety
labels attached to the equipment.
(1) 3-point hitch lowering speed knob
(A) “SLOW” (B) “FAST”
WHEN USING THE 3-POINT
HITCH
1. Use the 3-point hitch only with
equipment designed for 3-point hitch
usage.
2. When using a 3-point hitch mounted
implement, be sure to install the
proper counterbalance weight on
the front of the tractor.
3. When transporting on the road,
set the implement lowering control
in the "LOCK" position to hold the
implement in the raised position.
T66O122A
4. When operating stationary P.T.O
driven equipment, always apply
the tractor parking brake and place
chocks behind and in front of the
rear wheels. Stay clear of all rotating
parts.
5. Do not attach a PTO driven im-
plement if the implements safety
shields are damaged or not in place.
Rotating shafts are an entanglement
hazard.
S43O122A
TG300(HX9010,1001,1151,1301,1401)-수출(통합)-OM-01.indd 16TG300(HX9010,1001,1151,1301,1401)-수출(통합)-OM-01.indd 16 2022-08-16 오전 10:40:242022-08-16 오전 10:40:24

Table of Contents

Related product manuals