EasyManua.ls Logo

Daedong KIOTI CS2610 - Removal and INSTALLATION of 3-POINT Hitch Implement (with PTO Shaft); MOWER Implement

Daedong KIOTI CS2610
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CS2610
6
-
2
REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT (WITH PTO SHAFT)
MOWER IMPLEMENT
1. Park the tractor on level ground
and apply the parking brake.
M46O610A
(1) Lift Control Lever
2. To lift the lower link, pull the lift
control lever backward and stop
the engine.
(1) Lift (2) Connection Linkage
M46O612A
3. Roll the mower deck under the
tractor and position for connection
to the lift linkage.
M46O611A
When rolling the mower deck
under the tractor, be very care-
ful not to strike the hydraulic
lter with the mower deck.
IMPORTANT
M46-EU,AU-EEC인증용-06.indd 2 2017-04-26 오전 11:41:48

Table of Contents

Related product manuals