3-POINT HITCH IMPLEMENT OPERATION
INSTALLING PTO SHAFT
H11O682A
1. Consult your local KIOTI Dealer
for selection of the PTO Shaft.
2. W h en selectin g a PTO Shaft,
make sure that it is not too short to
come off of the female and male
shafts at the highest position or too
long to impact its female and male
shafts at the lowest position.
3. Move the joint back and forth to
check that its lock pin is properly
seated to the groove of the PTO
shaft.
(1) PTO Shaft
PTO type
Nominal
diameter
Number and
type
of splines
Nominal PTO
rated rotational
frequency
Recommended PTO
power at rated engine
speed(kW)
1 35
6 straight
splines
540 Up to 15.3
SPECIFICATION
PTO sheild guard
Category Regulation
T1 Compliance with ISO 500-1
(1) PTO Shaft Cover
(2) PTO Shaft Cap
Before you install the some kind of
implement, take off PTO shaft cap(2)
and install the universal joint of im-
plement.
If necessary, fold up the PTO shield
guard (1).