SiBE06-708_A
255 Trial Operation and Field Settings
Part 8
Trial Operation and
Field Settings
1. Trial Operation ....................................................................................256
2. Field Settings ......................................................................................257
2.1 Model Type Setting ..............................................................................257
2.2 When 2 Units are Installed in 1 Room..................................................258
2.3 Standby Electricity Saving....................................................................259
2.4 Facility Setting Jumper and Switch
(cooling at low outdoor temperature)....................................................260
2.5 Jumper and Switch Settings.................................................................261
3. Application of Silicon Grease to a Power Transistor
and a Diode Bridge .............................................................................262