3.2.2 Drilling template
125.0 (4.92)
Ø9.0 (Ø0.36)
14.0 (0.55)
NOTE The drawing is only a guideline and is not to scale.
3.3 Mounting BW indicators
To mount the indicator using the bracket, use two appropriate screws. These screws are not included.
The mounting bracket is asymmetrical and can therefore be arranged in two different ways.
NOTE
The distances between the bracket screw holes on BW144 and BW192 are the same mm).
Installation and commissioning guide 4189350024O EN Page 19 of 39