4 INSTALLATION
The installation must be carried out only by experienced staff, authorized by the manufacturer.
During the installation, make sure that the inverter is powered off.
4.1 Lifting, Transport and Unloading Instructions
Transport and Handling
Transport of the equipment, especially on the road, must be carried out with means able to protect the sy-
stem components (especially electronic components) from major impacts, humidity, vibrations, etc.
During handling, sudden or fast movements which could create dangerously sway the system must be
avoided.
Lifting
DELIOS s.r.l. normally packs and protects each component by using
devices able to ease its transport and handling operations but, gene-
rally speaking, these operations must be carried out by staff speciali-
zed in loading and unloading components.
The ropes and vehicles used for lifting must be suitable for withstan-
ding the weight of the equipment.
Do not lift multiple units or parts of the equipment at the same time,
unless otherwise stated.
The DLS is not equipped with specic lifting means.
Do not underestimate the weight of the DLS, check technical characteristics.
Do not move or stop the hanging load above people or things.
Do not let it drop or lay with too much force.
4.2 Unpacking and Checks
Remember that the packaging elements (cardboard, cellophane, staples, adhesive tape, straps, etc.) can
cut and / or injure, if not handled with care. They must be removed with appropriate means and must not be
handled by non-responsible people (i.e., children).
The packaging components must be removed of and disposed of according to the regulations in force in
the country of installation.
Check the integrity of the packaging before opening.
Open the packaging and remove the DLS with care to avoid damages to the external casing or the internal
electronic part.
Before starting the commissioning operations, make sure that the external casing of the DLS is in good
condition and free from transport damages.