ENGLISCH Kapitel 3 Seite 3
3
3.1 Commissioning Engine Operation
3.1.4 Filling/Venting the Cooling
System
3.1.5 Other Preparations
! Check battery and cable connections, see
6.7.1.
! Trial run
- After the engine has been prepared, let it
run for about 10 minutes without load.
During and after trial run
- Check the engine for leaks.
After the engine has been turned off
- Check the oil level and top up if
necessary, see 6.1.2.
- Tighten the V-belt, see 6.5.
! Breaking-in
During the break-in phase - about 200
operat-ing hours - check the oil level twice
a day.
After the engine is broken in, checking
once a day will be sufficient.
! Commissioning conserved engines
Remove conservation materials as
outlined in section 8.1
! 1012/1013
See section 6.3.4
! 1012 E/1013 E
See section 6.3.6
! Unit engine (with frontal radiator)
See section 6.3.8.
Engine never without coolant
operate.
(also not briefly)