Operating instructions, SM-110/-111
Servicing and maintenance
46
8
8.8.4 Replacing the round belt
1
2
4
3
[26-1] Round belt
[26-2] Upper belt pulley
[26-3] Lower belt pulley
[26-4]Deectionroller
Image 26 – Replacing the round belt
1. First remove the round belt [26-1] from the upper belt pulley [26-2].
2. First place the new round belt over the lower pulley [26-3], guide past the
deectionroller[26-4] at the bottom and pull it over the upper belt pulley.
8.8.5 Installing the housing
1. Put on the housing [27-5] screw in four screws [27-4] on the end faces of
the housing with the enclosed Phillips screwdriver.
1
2
3
4
4
5
Only for SM-111
[27-1] Countersunk screws
[27-2]Flangeincl.ttingscrew
[27-3] Star handle
SM-110 and SM-111
[27-4] Screws on the end faces of
the housing
[27-5] Housing
Image 27 – Installing the housing