Systems and Equipment - 142 JT100/JT100 All Terrain Operator’s Manual
Driver/Loader Attachment
Remove Anchors
1. Start drilling unit engine.
2. Ensure that anchor driver is attached to loader/driver and slowly swing loader/driver arm to front of
drilling unit.
3. Attach anchor driver to auger shaft.
4. Use loader/driver rotation and boom controls to slowly remove auger from ground.
Electric shock will cause death or serious injury. Stay
away.
274-049
To help avoid injury: Maintain minimum clearance of 10’ (3 m) between
loader/driver or load being lifted and energized power lines.
Turning shaft will kill you or crush arm or leg. Stay away.
Crushing weight could cause death or serious injury. Use
proper procedures and equipment or stay away
274-204.
IMPORTANT: Adjust outer boom while removing auger so that auger maintains 90° angle with
ground.