Operation Overview - 76 JT100/JT100 All Terrain Operator’s Manual
Planning
Planning
1. Gather information about jobsite. See page 81.
2. Inspect jobsite. See page 82.
3. Classify jobsite. See page 84.
4. Plan bore path. See page 87.
5. Check supplies and prepare equipment. See page 98.
6. Load equipment. See page 111.
Setting Up at Jobsite
1. Prepare jobsite. See page 97.
2. Unload drilling unit from trailer. See page 113.
3. Assemble drill string. See page 121.
4. Position drilling unit and frame. See page 117.
5. Assemble strike system. See page 151.
6. Anchor drilling unit. See page 139.
7. Connect fluid system. See page 117.
8. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch JT100 and is the answer not in the manual?

Ditch Witch JT100 Specifications

General IconGeneral
BrandDitch Witch
ModelJT100
CategoryConstruction Equipment
LanguageEnglish

Related product manuals