EasyManua.ls Logo

Ditch Witch JT100 - Page 146

Ditch Witch JT100
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT100/JT100 All Terrain Operator’s Manual Systems and Equipment - 145
Driver/Loader Attachment
2. Start drilling unit engine.
3. Unstow loader/driver remote control module and position yourself in full view of the path of the load.
4. Release loader/driver stow strap.
5. Using loader/driver remote control module, slowly swing loader/driver arm to pipe box.
Pipe Box Step
Use the pipe box step when loading and
unloading pipe boxes.
1. Pull pipe box step pin (1) to release pipe box
step (2).
2. Slide pipe box step (2) out of the frame and
release the pipe box step pin (1) to secure
step.
3. Use handle (shown) on the pipe box while
standing on the step.

Table of Contents

Related product manuals