Instructions for use Polaris 600 77
Maintenance
Light system
Component Interval Task Personnel responsible
Complete light and arm
system
Every 2 years
Check that the segment
and the screws on the ceil-
ing tube/spindle connec-
tion are secure. The
connection must be free
from damage.
Specialized service per-
sonnel
Check that the cable clips
in the spring arm are
undamaged. The cable
clips must be in the
intended position.
Check that all 4 screws on
the socket / socket attach-
ment connection are
seated correctly.
Check for paint damage
and cracks in plastic parts.
Check whether all plastic
parts are present and in
the correct position.
Check that the rating plate
is present and is readily
legible.
Perform functional and
visual inspection.