EasyManua.ls Logo

Eaton Magnefix MD4 - Page 40

Eaton Magnefix MD4
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Magnefix MD4
40
991.184 G01 03
Procedure
1. Incise the cable at the correct length, as shown.
L1 = 700 mm
REMARK
To simplify insertion of the cable cores in the right
tubes of the cable box, it is recommended to cut
the cable cores to different lengths.
2. Terminate the cable, as shown.
L2 = 200 mm
d = diameter across the lead sheath
Remove the lead sheath over distance (d).
Remove the sharp edges of the lead sheath.
1, 2
3. Saw off the cable box in accordance with the diameter
(d) measured across the lead sheath. Take into
account that several layers of polyethylene tape are to
be applied over the lead sheath.
4. Deburr sharp edges.
3, 4
5. Degrease the upper side of the lead sheath and sand
it lightly, for example, with a scouring pad.
6. Apply a couple of layers of polyethylene tape to the
lead sheath, so that the diameter measured across the
tape equals the inside diameter of the cable box.
Ensure that the upper side of the tape is flush with
that of the lead sheath
(see arrow).
Smooth out any wrinkles.
5, 6
REMARK
The filling opening is located at the front. Make
sure the paper insulation of the cores does not get
damaged (B).

Table of Contents

Related product manuals